Prepare the Pan to Paint the Pan

11/6/10

File (Embeded) - tools
 
 

Lewes FC is calling on supporters once again this close season to help give the Dripping Pan its annual makeover.

Assistant Manager Jason Hopkinson and coach Simon Gough were joined by members of the Management Committee last week to see what needs to be done in order to get the ground prepared for the new season.

As well as the usual tidying and painting jobs around the ground, Rooks fan Danny Last has been the driving force behind moves to improve the Rook Inn by turning it into a continental-style Supporters Bar and has gathered scarves and memorabilia from clubs throughout Europe to display on the walls - but it needs a spruce-up first!

With the additional work needed in the Rook Inn, it was felt that this year we would need to spread the work over two consecutive Sundays - one to "prepare" and one to "paint."

These will be held on Sunday July 4th and Sunday July 11th respectively, from 10am - 12.30pm. The more people who come along, the quicker the tasks will be completed and liquid refreshments will be supplied during the morning.

Please have a look at the list of jobs that need doing and come equipped accordingly if possible ie for cleaning on the 4th and for painting on the 11th. However, even if you don't have anything to bring with you, there will be tools and equipment that you can borrow so please come down and help out anyway.

There is an urgent need for the services of a plumber and a carpenter so please get in touch with the club via james.boyes@lewesfc.com and your details will be passed on if you can help out.

All help over the two days will be very welcome!

 

 

PREPARE THE PAN

4th July 

Changing Rooms

  1. Clean out and remove all rubbish including the old exercise bike.

  2. Clean toilets and showers (Plumber to check plumbing in home changing rooms).

  3. Wash ceiling and walls.

  4. Carpenter to repair/replace rail outside entrance to home dressing room (Urgent)

Outside

  1. Cut down overgrowth

  2. Repaint steps and all yellow lines

  3. Food Area - Clean and tidy up

  4. Wash dugouts and clean behind seats.

  5. General clean up around portacabin and main stand.

Rook Inn

  1. Clear of all rubbish

  2. Tidy/repair blinds

  3. Clean the trophy cabinet (and possibly relocate)

  4. Remove old TV.

  5. Wash ceiling

 

PAINT THE PAN

11th July


Changing Rooms

  1. Paint Ceilings and walls white

  2. Wash floors
  3. Clean fridge (Home dressing room)

Outside

  1. Finish painting any other areas (Yellow) 

  2. Food area -Re-paint white area around serving area

Rook Inn

  1. Paint walls and ceiling -White

  2. Wash Floor

 

Supplies required for both/either days:

  1. White matt emulsion

  2. White maisonery paint

  3. Paint Brushes

  4. Rollers and trays

  5. Black Bags

  6. Garden brooms

  7. Sanders and sand paper

  8. Buckets

  9. A skip

 